WHITE PAPERS
CONSIDER THIS BEFORE STARTING YOUR NEXT VISION SYSTEM PROJECT:
Before jumping into your vision system project, take a moment to review the following topics.
These points will help focus your thoughts on specific aspects of vision systems in the context of
your application, environment and employees. We hope to assist you in developing the right
solution.
by Clarence W. Hoover III , Geometric Controls, Inc. � 2013
CONSIDER THIS BEFORE STARTING YOUR NEXT VISION SYSTEM PROJECT
INDUSTRIAL WIRELESS SYSTEMS - APPLICATION CONSIDERATIONS:
Presented here are tools and techniques to plan and design a wireless communication system for an industrial control application. Basic concepts of signal gain, radio transmission and transceiver hardware components are discussed as a foundation. A functional approach to system design based on the assessment of the application requirements with practical examples is offered. The importance of a site survey in the system design is presented along with useful methods of site terrain and energy spectrum analysis. System gain calculations and the final hardware selection process are described. Application examples are given.
by D. Pretty, Geometric Controls, Inc. � 2013
INDUSTRIAL WIRELESS SYSTEMS - APPLICATION CONSIDERATIONS
2011 International Coal Conference Presentation
AUTOMATION OF FORMALLY DECOMMISSIONED COAL PREPARATION FACILITY:
GCI (Systems Integration Company) was invited to participate in the rebirth of the New Saint Nick, decommissioned coal preparation facility owned by Reading Anthracite. Discussion focuses on the collaborated effort to provide a cost effective control solution and the challenges associated with providing a simplified operation.
by D. Pretty, Geometric Controls, Inc. � 2013
AUTOMATION OF FORMALLY DECOMMISSIONED COAL PREPARATION FACILITY
2011 International Coal Conference Presentation
|